Gas turbines with dln-1 combustion systems gas only. Iron GE 106636 Owner's Manual 20 pages. Read Online Ge Frame 6 Gas Turbine Service Manual GE Frame 6B Core Engine has run 42,973 hours and 311 starts and has recently undergone a Major Inspection, since this inspection the engine has run only a few hours. 115KV-SF6 Gas Insulated Switchgear with 115KV.2nos SEC OHL, 13. Ge Frame 6 Gas Turbine - fapo.undiscuss.it Page 9/25. GE Oil & Gas Frame 6 Gas Turbine The MS6001B is a proven 40-MW class gas turbine that can be quickly installed for power generation or mechanical drive service.
Since 2004, PSM has been providing gas turbine solutions for Frame 6B hot gas path buckets, nozzles & shrouds and compressor hardware. Improved durability and lower life cycle cost is achieved using PSM’s component and system level product modeling and data evaluation tools, to identify the issues and failure modes in current Frame 6B OEM gas turbine designs.
PSM manufactures all gas turbine buckets, nozzles and shroud blocks to be compatible with the latest 2085F firing temperature machines – the Engine Model 6571 – and are also backwards compatible. In normal operation the entire Frame 6B hot gas path has a minimum service interval of 24,000 FFH or 900 FS, which can be increased to 32,000 FFH on a unit by unit basis, with consultation from PSM’s experts.
1st Stage Nozzle
- Equivalent to OEM
- Optional NiCoCrAlY & TBC Coatings
1st Stage Buckets
- Improved Aero blade profile and cooling
2nd Stage Nozzle
- Equivalent to OEM
2nd Stage Buckets
- Scalloped tip shroud for improved creep resistance
- Increased tip shroud contact face area mitigates shingling
3rd Stage Nozzle
- Equivalent to OEM
3rd Stage Buckets
- Increased tip shroud contact face area mitigates shingling
LEC III™: Field proven 3-5ppm NOx
and
Ge Gas Turbines Frame 7
LEC-NextGen: Highly durable sub 9ppm NOx
Compatible with 6581B, 7121EA, 9171E and older turbine models either as a drop in replacement to the OEM DLN1.0 or as a conversion from standard diffusion frame systems. The system has proven versatility with over 70 installations globally on GE Frame 6B, 7E/EA, 9E and most recently 4 x 7B units. Originally fielded in 2001, the patented LEC III™ fuel air mixing technology produces consistent sub 5ppm NOx and single digit CO.
General Electric 7fa Gas Turbine
![Gas Gas](/uploads/1/1/9/5/119568818/866021455.jpg)
Introduced in 2015, the LEC-NextGen has been developed from the original LEC-I and LEC III™ systems in response to the global power generations requirements for increased durability throughout an increased load range, while maintaining sub 9ppm NOx and single digit CO throughout pre-mix operation.
Ge Frame 7fa Gas Turbine
Looking for Brochure Downloads?
Frame 5 Gas Turbine Manual
Find additional information regarding PSM's Products and Services on our Media page, under the Brochure Downloads section.